Location: London - UK
Customer: MVB JV
Working years: 2014 / 2015
Project information: SCL of 7 km Thames Water sewage tunnel.
The innovative system was designed to carry out a 360° concrete secondary lining guaranteeing a final finishing without holes or steps.
The machine was equipped with a PLC capable to check the concrete pressure during the casting. Steel form section were full hydrostatic and it was possible to achieve a rate of advancement of 300 meters per week.
Supplied equipments: No.6 Fullround Shutters with related Curing Gantries, No.2 Service Gantries, Invert Traveller, TBM Service Machine.
Additional Services:
Machine installation , Machine Transformations , Machine Removal ,
Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).