Array ( [0] => 1 [1] => 3 [2] => 4 )

Galgenbucktunnel

Location: Schaffhausen – Switzerland
Customer: ARGE WIGA
Working years: 2016 / 2017
Project information: Construction of a 1.138m tunnel between Schaffhausen and Neuhausen. The maximum slope in the tunnel is 4.5%.
Supplied equipments: Formwork, Curing gantry, Reinforcement and Magazine gantry, Invert Formwrok, Deck Formwork, TSK Transport System
Additional Services: Machine installation , Machine Transformations , Machine Removal ,

Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).

Confirm
Reject