Array ( [0] => 1 [1] => 3 [2] => 4 )

Herrschaftbucktunnel

Location: Rheinfelden - Germany
Customer: BeMo Tunnelling GmbH
Working years: 2017
Project information: • double-lane motorwaytunnel, 2 tubes (North- and Southtube)
• Northtube
Tunnel Length: 485.00 m
• Southtube
Tunnel Length: 475.00 m
• Final Lining:
In-situ concrete (reinforced - Northtube: 40-60 cm/ Southtube 60-80 cm)
Supplied equipments: Provision of a complete Secondary Lining Train plus,
No.1 Enlargement formwork
No.3 Niches
No.1 Modular External Formwork
Additional Services: Machine installation , Machine Transformations , Machine Removal ,

Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).

Confirm
Reject