Array ( [0] => 1 [1] => 4 )

ARGE Tunnel Cannstatt S21

Location: Stuttgart - Germany
Customer: ATC S21
Working years: 2019 / 2020
Project information: Tunnel (single- and double-track) incl. branch-off structure, connection structure with lengths > 100 m (total length approx. 630 m), 1 smoke extraction structure, emergency gallery with connecting gallery, branch-off structure and crossing structure, emergency access and two intermediate headings, underpassing existing buildings and bridges

Total length: approx. 7,950 m
Supplied equipments: Supply of No.2 Formworks provided with the Putzmeister Formkret Automated Concrete filling system.
Additional Services: Machine installation , Machine Removal ,

Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).

Confirm
Reject