Array ( [0] => 1 [1] => 4 [2] => 7 )

MNTLB - Connection Tunnel

Location: UK
Customer: BMB JV
Working years: 2021 - 2022
Project information:
Supplied equipments: The 150m long MNTLB connection tunnel delivered by the Tideway West section JV was part of the big sewage scheme connecting West and Central.

KERN Tunneltechnik has engineered and supplied a Formwork Shutter system able to work around tight curves as well as with different primary linings, segments and shotcrete.

The system has been completely pre-assembled and tested in our workshop at KTS.

Additional Services: Machine installation , Machine Removal , Supervision ,

Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).

Confirm
Reject