02.09.2021 /

Kramertunnel - Jobsite Installation

At Kramertunnel is going on a full jobsite installation process.
KERN Tunneltechnik is supplying several tunnel formworks and machines for secondary lining.
The project is being delivered by BeMo Tunnelling.




Privacy
By using this site, you accept the use of our cookies. We use cookies to provide you with a better experience and to improve the performance of your site.

Confirm