12.06.2026 /
With the installation of its Straddle Gantry at the Atlas Road site, KERN Tunneltechnik strengthens its collaboration with SCS JV, supporting advanced tunnel logistics within the HS2 project.
Specifically designed for the transport of segments, the gantry features a lifting capacity of up to 30 ton, wheel adjustability, and PLC-controlled operations, ensuring safe, and flexible handling in constrained environments.
This gantry highlights KERN’s commitment to delivering reliable, high-performance lifting solutions tailored to the complex demands of major infrastructure projects.

Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).