25.07.2022 /

Last week our team in Germany successfully casted the last concrete block of the Reicholzheim tunnel.
Works have been performed within given schedule and maintaining the highest safety standards considering challenging conditions of daily railway traffic.
For the purpose of this project KERN engineered and produced special tunnel inner lining system consisting of formwork structure and multipurpose, self-driving carrier used for transport of reinforcement and formwork.
Works on site have been performed by our KERN Power team.
We congratulate our customer Baresel GmbH for achieving this great milestone and thank our teams within KERN Group for this excellent performance.
Privacy
We use cookies to improve your browsing experience, analyze traffic, and optimize site performance.
You can accept all cookies, reject non-essential ones, or manage your preferences at any time.
Essential cookies are always active, while analytics and marketing cookies are used only with your consent.
All data is processed in accordance with the EU General Data Protection Regulation (GDPR).