20.05.2025 /
The Hampton Roads Bridge-Tunnel (HRBT) Expansion Project, located in USA, continues to make progress.
KERN has supplied custom-engineered Egress Wall Formwork systems designed specifically for this large-scale infrastructure project. The formworks and the automation system are designed to work in synergy, enabling rapid construction cycles, safety, and great finish quality.
As the HRBT project advances, the use of such high-performance equipment is helping to ensure that the demanding schedule and technical requirements are being met. KERN Tunneltechnik is proud to be a key contributor to one of the most ambitious transportation projects in Virginia.
Privacy
By using this site, you accept the use of our cookies. We use cookies to provide you with a better experience and to improve the performance of your site.